370 |
Industrial Engineering (Italy): HMI design and development for NAM machine |
05/2017 |
|
369 |
Centrale Rossi (VI - Italy) - Interconnection solution study between paper factory and HPP for the use of the HPP's generated power directly by the factory |
05/2017 |
|
368 |
Support for the development of the prototype SAS2006 for RFI: HV/MV control and monitoring system for substations acquired by TERNA |
05/2017 |
|
367 |
Consulting |
05/2017 |
|
366 |
Malpensa 132kV HV substation (VA - Italy) - on-site support for issues on PLC and protection systems |
05/2017 |
|
365 |
Pergine (TN - Italy): SCADA system for MV switchyards control and command: system modification for the new insertion of 5 new MV power distribution sites |
05/2017 |
|
364 |
Malpensa 132kV HV substation (VA - Italy) - on-site support for issues on PLC and protection systems |
05/2017 |
|
363 |
CH Castelpietra, CH Zivertaghe, et reseau de distribution MT 20kV (TN - Italie): systeme de control a distance - renouvellement du contrat
|
05/2017 |
|
362 |
Lufubu HPPs (Zambia): technical specialist support for the EM technical specification of the HPPs |
12/2016 |
|
361 |
EZFILL machine SCADA design: redundant SCADA system in a pharmaceutical environment for a silicon-sealing line and carpules (glass vessels for injections) closure in a sterile cleanroom |
11/2016 |
|
360 |
SIG interface implementation: development and implementation of a Windows-based interface for data collection on the OPC UA protocol, and operator's visual interaction by reports and graphical inerface |
10/2016 |
|
359 |
Pergine (TN - Italy): Remote and on-site activities support contract on the SCADA system |
09/2016 |
|
358 |
San Silvestro HPP (TN - Italy): Automation (PLC) system integration for the main switchyard control and command |
09/2016 |
|
357 |
San Silvestro HPP (TN - Italy): SCADA system integration for the main switchyard control and command |
09/2016 |
|
356 |
ACSM Primiero San Martino di Castrozza (TN - Italy): New SW program for the data management of the energy service interruptions (quality of service), as per Electric Energy Authority prescriptions |
09/2016 |
|
355 |
Rendelstein HPP (BZ - Italy): Remote and on-site activities support contract |
08/2016 |
|
354 |
Pannelia HPP (UD - Italy): Consulting and technical support for the hydraulic turbine efficiency tests performing |
07/2016 |
|
353 |
Chacayes HPP (Chile): Technical consulting activities on the electrical protection system |
07/2016 |
|
352 |
SEH Pontives HPP (BZ - Italy): Design, devices programming and testing and site commissioning for the electrical protections and synchronizing equipments of the hydroelectric generation unit |
07/2016 |
|
351 |
Pouzin HPP (Francia): Factory as-built documentation on selected documents. |
06/2016 |
|
350 |
Pallets system schemes: SW modifications on the pallets system schemes, and optimisation of the implemented research procedure
|
06/2016 |
|
349 |
Honduras HPP: Some modifications to be implemented in the automation (PLC) and supervision (SCADA) SW coding |
05/2016 |
|
348 |
Molini di Tures HPP (BZ - Italy): electrical drawings update activity |
05/2016 |
|
347 |
Aconcagua HPP (Chile): design of the new hydraulic control panel for the unit's safety spherical valve command and control |
05/2016 |
|
346 |
SCADA design - Data Logger module: design and implementation of a SCADA system for the DATA LOGGER module management in the UTECO company large printing machines |
04/2016 |
|
345 |
SCADA and Analyzer for DRUPA: SCADA platform design and development, to collect management and control data from different large production machines, and to display them in 3D figures on a 46" touch panel type monitor (for the DRUPA exhibition in Düsseldorf D)
|
03/2016 |
|
344 |
SCADA Energy Module: SCADA design and development for the ENERGY module management in the UTECO company large printing machines |
02/2016 |
|
343 |
SCADA ink module: SCADA system modification for the ink module management in the UTECO company large printing machines |
02/2016 |
|
342 |
Industrial Engineering (Italy): HMI design and development for NAM machine |
02/2016 |
|
341 |
Pergine (TN - Italy): SCADA system for MV switchyards control and command: system modification for the new insertion of 5 new MV power distribution sites |
02/2016 |
|
340 |
ACSM Spa (TN - Italy): Remote and on-site activities support contract |
01/2016 |
|
339 |
Chacabuquito HPP (Chile): - technical activities for the electrical protections and synchronizing equipments programming, testing and commissioning |
01/2016 |
|
338 |
SEA Energia Spa (VA - Italy): Technical support to the Terna operators for the TR1 and TR2 electrical protection tests |
02/2016 |
|
337 |
Almarai (Saudi Arabia): new routines and updates to the CCP2's unit pallets management system, and with the Company's SAP data exchange |
01/2016 |
|
336 |
Los Negros 2 HPP (Costa Rica). Supporting Lombardi SA, check of the design documentation produced by the contractor about the electromechanical components of the new plant |
01/2016 |
|
335 |
Aconcagua HPP (Chile): Revamping of the electrical protection system of the plant's common services |
12/2015 |
|
334 |
BBE project (Italy): Due diligence for all electromechanical and civil/hydraulic aspects for the purchasing evaluation of 4 hydro power plants authorizations in Lombardia region |
12/2015 |
|
333 |
Colmeda HPP (BL - Italy): Technical expertise on Unit 1 and 2 transformers |
12/2015 |
|
332 |
Industrial Engineering (Italia): HMI for OEE module |
11/2015 |
|
331 |
Industrial Engineering (Italia): HMI for a coupling unit |
11/2015 |
|
330 |
Aconcagua HPP (Chile): Schemes update as consequence of the new generator installation for the ""Blanco"" power generating unit |
11/2015 |
|
329 |
Pergine (TN - Italy) - Monitoring interface implementation between STET and TERNA |
11/2015 |
|
328 |
Aconcagua HPP (Chile): Revamping of the ""Juncal"" power generating unit and of the plant's common services |
11/2015 |
|
327 |
Castelpietra HV 132kV substation (TN - Italy): transformers TRA and TRB Automatic Voltage Regulator implementation |
11/2015 |
|
326 |
Malpensa HV substation (VA - Italy) - server 1 resetting and restarting |
11/2015 |
|
325 |
Industrial Engineering (Italia): HMI for unit ""flowpack"" in SIG project |
11/2015 |
|
324 |
Malpensa HV substation (VA - Italy) - update of the HV substation monitoring system towards TERNA |
10/2015 |
|
323 |
Jiji and Mulembwe HPP Project (Burundi): Support to the Owner Engineer for tender assignation and electromechanical works execution |
07/2015 |
|
322 |
Rossi HPP (VI - Italy): database signals integration and logics modifications in the automation and supervision systems of the common services for the installation of the new generation unit no. 3 |
09/2015 |
|
321 |
Hydro Power Plant in Honduras: Intake database signals integration in the automation and supervision systems |
09/2015 |
|
320 |
Industrial Engineering (Italy): Connection between ABB MES and UTECO machine through SCADA ZENON |
08/2015 |
|
319 |
Malpensa 132kV HV substation (VA - Italy) - on-site support for issues on PLC systems |
08/2015 |
|
318 |
RODI project (Italy): Due diligence for all electromechanical aspects for evaluating of existing HDE hydro power plants in Trentino region (dry components). |
08/2015 |
|
317 |
Pergine (TN - Italy) - Contract for remote assistance and site activities upon request |
08/2015 |
|
316 |
Zivertaghe HPP (TN - Italy): ac and dc distribution auxiliary boards and battery charger design; integration of the new boards in existing PLC and SCADA automation systems |
07/2015 |
|
315 |
Mignano HPP (VI - Italy)- automation, command control and protection systems repowering: final phase design, expediting of equipments, commissioning on site |
11/-0001 |
|
314 |
Cambambe HPP (Angola). Supporting Lombardi SA, electromechanical components check for the new spillways' gates of the dam. |
07/2015 |
|
313 |
Lappago HPP and HV substation (BZ - Italy): CEI 0-16 protections test |
07/2015 |
|
312 |
Hydro Power Plant in Honduras: PLC and SCADA systems software development |
07/2015 |
|
311 |
TERNA network rules A72 - RIGEDI: SCADA system update |
07/2015 |
|
310 |
Castelpietra HPP, Zivertaghe HPP and 132kV substation an 20 kV distribution network (TN - Italy): update of SCADA supervision system |
05/2015 |
|
309 |
Pergine (TN) - remote control system - implementation of 5 new distribution switchgears in the supervision
|
04/2015 |
|
308 |
HMI development for NAM machine control |
03/2015 |
|
307 |
Castelpietra HPP, Zivertaghe HPP and 20kV distribution network: Tests performance for the incorporation of existing and new multifunctional protective devices GE F650 in the existing supervision system
|
02/2015 |
|
306 |
SCADA systems project for hystorical analisys of rotating printer INK MODULE |
02/2015 |
|
305 |
Tumbucis: Detail design for tender document
|
02/2015 |
|
304 |
Centrale di Basiliano (UD): Inspections on the hydraulic machine
|
02/2015 |
|
303 |
Remote control and site survey on demand |
01/2015 |
|
302 |
Rendelstein HPP (BZ): Contract for remote assistance and site activities upon request |
10/2014 |
|
301 |
Malpensa HV substation - electrical engineering and commissioning of temporary box for automation board replacement of TRS3 feeder |
12/2014 |
|
300 |
Colmeda HPP (TN) - upgrade of PLC and SCADA logics for nozzles cleaning function
|
10/2014 |
|
299 |
Pergine (TN) - Contract for remote assistance and site activities upon request |
11/2014 |
|
298 |
Ponte Gardena (Bz):HPP electrical protection system - programming, tests on the equipments and commissioning
|
10/2014 |
|
297 |
Malpensa HV substation: Change of monitoring system with requirements from Terna
|
10/2014 |
|
296 |
Cerro dell'Aguila HPP (Perù) : electrical engineering, expediting co-ordination, tests on the equipments and commissioning support for the new automation, control, command and protection unit's systems. |
09/2014 |
|
295 |
Moba HPP: Electrical engineering for new third power unit |
10/2014 |
|
294 |
Castelviero HPP (TV) - Electrical schema changes
|
10/2014 |
|
293 |
Programming new Thytronic NVA100X protections and change of Modbus RTU management in Castelpietra and San Martino |
10/2014 |
|
292 |
Sarentino HPP and HV substation (BZ): supply and commissioning of the engineering station for the supervision of automation |
10/2014 |
|
291 |
Castelviero HPP: software modifications and on-site tests |
06/2014 |
|
290 |
Milano Linate airport: consultancy support for general electrical items, and of two MV network black-outs. |
10/2014 |
|
289 |
Aconcagua HPP - Blanco unit (Chile): electrical engineering, expediting co-ordination, tests on the equipments and commissioning support for the new automation, control, command and protection unit's systems. |
06/2014 |
|
288 |
Vertova HPP: EM Due diligence for purchasing |
05/2014 |
|
287 |
Packaging: implementation of an HMI systems for SIG company |
05/2014 |
|
286 |
Delta Project (Turchia): Due diligence for all electromechanical aspects for purchasing of 5 existing and 1 in design phase hydro power plants. |
05/2014 |
|
285 |
Castelpietra HPP, Zivertaghe HPP and 20kV distribution network: Tests performance for the incorporation of new multifunctional protective devices Thytronic NVA100X in the existing supervision system |
04/2014 |
|
284 |
Pergine (TN) - remote control system - on-site tests |
04/2014 |
|
283 |
Pergine (TN) - remote control system - implementation of 5 new distribution switchgears in the supervision |
04/2014 |
|
282 |
Rossi HPP (Arsiero, VI): Electromechanical activities for tender documents production for a new hydroelectric generation unit named "GR240", in the Rossi's hydroelectric power plant, in Arsiero. |
04/2014 |
|
281 |
Pannelia HPP (UD): assistance and support directing the works for the plant re-activation |
03/2014 |
|
280 |
Sarentino HPP and HV substation (BZ): new water level regulator design and installation |
04/2014 |
|
279 |
Basiliano HPP (UD): assistance and support directing the works for the plant renewal |
02/2014 |
|
278 |
Centrale Rossi (VI) -Interconnection solution study between paper factory and HPP for the use of the HPP's generated power directly by the factory |
01/2014 |
|
277 |
Castelviero HPP (TV) - complementary activities required on site with experts presence |
01/2014 |
|
276 |
Sarentino HPP and HV substation (BZ): complementary activities
|
12/2013 |
|
275 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - substation automation PLC system update
|
11/2013 |
|
274 |
Pergine (TN) - remote control system - protections measurements acquisition on Wago PLC through ModBus TCP
|
11/2013 |
|
273 |
Pergine (TN) - SCADA PC renewal of warranty
|
11/2013 |
|
272 |
Pergine (TN) - Contract for remote assistance and site activities upon request
|
10/2013 |
|
271 |
Sarentino HPP and HV substation (BZ): training on PLC logics
|
10/2013 |
|
270 |
Pergine (TN) - insertion on the existing SCADA system of 2 new switchgears
|
10/2013 |
|
269 |
Castelpietra HPP (Fiera di Primiero, TN - Italy): Petersen coils insertion - adjustemets on automation and supervision system
|
10/2013 |
|
268 |
Basiliano HPP (UD): Detail design for tender document for the plant renewal
|
09/2013 |
|
267 |
Castelpietra HPP (Fiera di Primiero, TN - Italy): replacement of ancillary systems HMI
|
09/2013 |
|
266 |
Castelviero HPP (TV) - complementary activities required
|
06/2013 |
|
265 |
Sarentino HPP and HV substation (BZ): complementary activities required for PLC and SCADA system
|
06/2013 |
|
264 |
Vieze HPP (CH): - complementary activities required |
06/2013 |
|
263 |
Sarentino HPP and HV substation (BZ): complementary activities required for drainage system integration |
05/2013 |
|
262 |
Castelviero HPP (TV) - complementary activities required |
11/2012 |
|
261 |
Castelpietra HPP (Fiera di Primiero, TN - Italy): ac and dc distribution auxiliary boards and battery charger design; integration of the new boards in existing PLC and SCADA automation systems |
02/2013 |
|
260 |
Huallin HPP (Peru) - detail electromechanical design, electrical protections programming and testing, control locics programming, SCADA programming, expediting of the suppliers, commissioning co-ordination |
03/2012 |
|
259 |
Castelpietra HPP, Zivertaghe HPP, HV Castelpietra substation, MV network (TN): Contract for remote assistance and site activities upon request |
01/2013 |
|
258 |
Colmeda HPP - extra activities for pipe re-painting |
01/2013 |
|
257 |
Rendelstein HPP (BZ): Contract for remote assistance and site activities upon request |
08/2012 |
|
256 |
Pergine (TN) - ZENON's based SCADA updates |
06/2012 |
|
255 |
Alpignano HPP - automation, command control and protection systems repowering: final phase design, expediting of equipments, commissioning on site |
06/2012 |
|
254 |
Pouzin PCH - detail electromechanical design, electrical protections programming and testing, control locics programming, SCADA programming, expediting of the suppliers, commissioning co-ordination |
03/2012 |
|
253 |
Taio - S. Giustina HPP (TN) - short circuit calculation report |
01/2012 |
|
252 |
Castelviero HPP (TV) - complementary activities required |
11/2011 |
|
251 |
Predazzo HPP and HV substation (TN): detail electromechanical design, electrical protections programming and testing, expediting of the suppliers, commissioning co-ordination |
11/2011 |
|
250 |
Vi?ze HPP (CH): detail electromechanical design, electrical protections programming and testing, control locics programming, SCADA programming, expediting of the suppliers, commissioning co-ordination |
10/2011 |
|
249 |
Molini di Tures HPP and HV substation (BZ): detail electromechanical design, electrical protections programming and testing, expediting of the suppliers, commissioning co-ordination |
10/2011 |
|
248 |
Lappago HPP and HV substation (BZ ): detail electromechanical design, electrical protections programming and testing, expediting of the suppliers, commissioning co-ordination |
10/2011 |
|
247 |
Castelpietra HPP, Zivertaghe HPP, HV Castelpietra substation, MV network (TN): Contract for remote assistance and site activities upon request |
09/2011 |
|
246 |
Sarentino HPP and HV substation (BZ): detail electromechanical design, electrical protections programming and testing, control locics programming, SCADA programming, expediting of the suppliers, commissioning co-ordination |
09/2011 |
|
245 |
Luincis HPP (UD): Technical support and drawings for tender |
08/2011 |
|
244 |
Svrajen and Lakatnik HPP (BG): Contract for remote assistance and site activities upon request - yearly renewal |
08/2011 |
|
243 |
Opletnia, Tserovo and Prokopanik HPP (BG): Electrical engineering activities |
08/2011 |
|
242 |
Basiliano HPP (UD): Detail design and tender documents for the plant renewal; permitting documentation for green certificates |
08/2011 |
|
241 |
Centrale di Forte Buso: electromechanical specialist supporting the site works control |
07/2011 |
|
240 |
Rendelstein HPP (BZ): photographic books production and supply |
06/2011 |
|
239 |
Primiero (TN): Remote control based on IEC 60870-5-104 protocol of the MV switchgears |
05/2011 |
|
238 |
Lungudi HPP (Congo): Signal Insulators' supply |
04/2011 |
|
237 |
Busche HPP - HMI panel reparation |
03/2011 |
|
236 |
Malpensa Airport: New perturbographic system: final tests with TERNA |
03/2011 |
|
235 |
Lungudi HPP - G1+G2 (Congo): unit's commissioning and network islanding tests |
01/2011 |
|
234 |
Colmeda HPP - extra activities for hydraulic final phase design and works supervision |
01/2011 |
|
233 |
Castelviero HPP - automation, command control and protection systems repowering: final phase design, expediting of equipments, commissioning on site |
01/2011 |
|
231 |
Pergine - ZENON's based SCADA implementation and commissioning |
11/2010 |
|
230 |
Rovigo HV substation: Detail design for National Grid interconnection (TERNA) |
11/2010 |
|
229 |
Lungudi G2 HPP (Congo) - commissioning: 2nd phase |
09/2010 |
|
228 |
Lungudi HPP G2 (Congo) - commissioning: 1st phase |
09/2010 |
|
227 |
Chiavenna HPP - electro-instrumental installations engineering |
08/2010 |
|
226 |
Cormor HPP (UD) - Green Certificates qualification procedure |
08/2010 |
|
225 |
Opletnia, Zerovo e Prokopanik HPP (Bulgaria)- detail design phase: re-engineering due to suppliers' contractual modifications |
07/2010 |
|
224 |
Svrajen & Lakatnik HPP (Svoghe, Sofia - Bulgaria): SCADA system change with migration from Tecnomatix Factory Link to CopaData Zenon |
06/2010 |
|
223 |
Opletnia, Zerovo e Prokopanik HPP (Bulgaria)- detail design phase: hydraulic gates design |
04/2010 |
|
222 |
SCADA systems: drivers for IEC 870-5-104 protocol interface supply |
06/2010 |
|
221 |
Malpensa Airport: New perturbographic system design |
04/2010 |
|
220 |
20kV distribution network, Primiero (TN): Distribution system upgrade from 10kV to 20kV - SCADA and PLC adapting activities |
04/2010 |
|
219 |
Minervino Wind Park - Bari: SCADA maximum power generation control system implementation |
04/2010 |
|
218 |
Mercatale di Sassocorvano HPP (PU): Testing and validation of the electromechanical supply |
04/2010 |
|
217 |
Linate Airport (MI): Generation plant remote monitoring implementation from TERNA with IEC 60870-5-104 protocol |
03/2010 |
|
216 |
Mulini sul Ledra HPP (UD): Green Certificates qualification procedure |
03/2010 |
|
215 |
Rubano PV plant (PD) : Maintenance and reparation activities |
03/2010 |
|
214 |
San Silvestro HPP (TN): Electromechanical final design for the HPP repowering |
03/2010 |
|
213 |
20kV distribution network, Primiero (TN): Updating of the existing PLC and SCADA systems of a new electrical protection on 60kV Castelpietra-San Martino feeder |
01/2010 |
|
212 |
Colmeda HPP (BL) - penstock renewing: update of the detail design, works supervision and safety plan |
12/2009 |
|
211 |
Opletnia HPP (Bulgaria) - Electrical engineering activities for detail design phase |
12/2009 |
|
210 |
Castelpietra 132kV substation - New transformer differential (GE T60) and line distance (GE D60) portections commissioning and testing |
11/2009 |
|
209 |
Malpensa Airport: Malpensa Energia generation plant - Remote monitoring service and on-site activities contract |
10/2009 |
|
208 |
Mereto di Tomba PV plant (UD): photovoltaic plant design and bid evaluation |
09/2009 |
|
207 |
Colmeda HPP (BL)- New penstock installation: safety activities planning during design phase |
09/2009 |
|
206 |
Svrajen & Lakatnik HPP (Svoghe, Sofia - Bulgaria): Remote monitoring service and on-site activities contract |
06/2009 |
|
205 |
Training activity: two sessions of training course about "hydro power plants managent and operation with PLC systems" |
06/2009 |
|
204 |
Forte Buso HPP (TN): Detail design for the new plant (electromechanical and mechanical components) |
06/2009 |
|
203 |
Cormor HPP (UD): Final design and technical specification for the plant's renewing bid |
05/2009 |
|
202 |
Rio Siera HPP (UD): Electromechanical prelimninary design for governement permissions |
05/2009 |
|
201 |
Castelpietra HPP, Zivertaghe HPP and 20kV distribution network: Update of the existing SCADA systems from Tecnomatix Factory Link to CopaData Zenon |
04/2009 |
|
200 |
Malpensa Airport: New substation remote monitoring system implementation for TERNA control by IEC 60870-5-104 protocol |
04/2009 |
|
199 |
Lungudi HPP G1 (Congo) - commissioning |
04/2009 |
|
198 |
Castelpietra HPP, Zivertaghe HPP and 20kV distribution network: Update of the existing system for service interruption monitoring as per new deliberation of the Italian Authority nr. 333/2007 |
03/2009 |
|
197 |
Signal Insulators' supply |
02/2009 |
|
196 |
Remote control system - supply and commissioning of a new MV substations remote control based on GPRS phone connection - phase II |
01/2009 |
|
195 |
Svrajen & Lakatnik HPP (Svoghe, Sofia - Bulgaria): Activities and supplies to complete and for a better integration of both HPP |
01/2009 |
|
194 |
Rossi HPP (Arsiero, VI): Electromechanical activities supervision, expediting and factory tests on the hydraulic, mechanical and electrical equipments, of the autoamtion and supervision systems, and of the interconnection to the local distribution MV grid. |
12/2008 |
|
193 |
Lungudi HPP G1+G2 (Congo) - plant renewing - detail design of the automation, protection and supervision systems of the two generation units |
12/2008 |
|
192 |
Svrajen HPP (Svoghe, Sofia - Bulgaria): Professional consultancy |
11/2008 |
|
191 |
Malpensa Airport: Baggage Handling System (BHS) - Site analisys and design of the modification activities that are necessry for a better availability of the Terminal 1 and Terminal 2 plants |
12/2008 |
|
190 |
Remote control system - supply and commissioning of a new MV substations remote control based on GPRS phone connection - phase I |
12/2008 |
|
189 |
Albania HPP - Final electromechanical design for 2 new HPPs |
06/2008 |
|
188 |
Albania HPP - Feasibility electromechanical study for 2 new HPPs |
06/2008 |
|
187 |
Lungudi HPP (Congo) - electromechanical functional engineering and for plant revamping |
08/2008 |
|
186 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - substation automation PLC system extension for new interface with the new ariport electrical network DCS |
08/2008 |
|
185 |
Aviano HPP - electromechanical engineering and tender documentation drawing-up for plant revamping |
06/2008 |
|
184 |
HPPs in Albania - feasibility study for new hydro power plants |
06/2008 |
|
183 |
Svrajen & Lakatnik HPP (Svoghe, Sofia - Bulgaria): commissioning |
10/2007 |
|
182 |
Colmeda HPP: documentation development for design identification and technical specitications to obtain green certificates |
02/2008 |
|
181 |
Busche HPP: signal programming toward the remote control center |
02/2008 |
|
180 |
Castelpietra 132kV substation (Fiera di Primiero, TN - Italy): transormer differential protection substitution
Zivertaghe HPP: exciter maintenace
SCADA: FactoryLink 8.0 installation and setup |
12/2007 |
|
179 |
San Giacomo di Fraele HPP (Sondrio - Italy): on site extra activities |
12/2007 |
|
178 |
Svrajen & Lakatnik HPP (Svoghe, Sofia - Bulgaria): hardware supplying and PLC automation system software development |
10/2007 |
|
177 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy).
Remote assistance Service and on-demand intervention |
10/2007 |
|
176 |
Rescia HPP: Electrical engineering for plant revamping |
08/2007 |
|
175 |
Pedra 'e Othoni HPP : Additional activities for plant commissioning |
07/2007 |
|
174 |
Rendelstein HPP (BZ - Italy). Preliminary and detail design of the automation, protection, control and remote monitoring of the plant.
Implementation of all the automation codes of the two units and of the auxiliary/general services on Siemens Simatic S7-400 with ET-200M decentralized periphery and Siemens HMI touch panels.
Programming, setting and verification of the electrical protection relays (Siemens Siprotec).
Plant commissioning |
07/2007 |
|
173 |
Technical and methodological support to supervision of works for contract of the new automation ant control system of electric networks and the new high-speed communication network |
07/2007 |
|
172 |
Additional activities for Malpensa 2000 substation commissioning |
07/2007 |
|
171 |
Documentation development for re-activation of hydroelectric concession |
05/2007 |
|
170 |
Chiavenna HPP: Electrical engineering for plant revamping |
06/2007 |
|
169 |
"Rossi" HPP (Arsiero, VI): Support to supervision of works and to hydraulic, electric, oil-pressure, auxiliary systems equipment, automation and supervision of the plant and connection to MV ENEL distribution network. |
04/2007 |
|
168 |
San Giacomo di Fraele HPP: Control of a new immersion pump. Commissioning and remote support. |
05/2007 |
|
167 |
Rendelstein HPP: Documentation development for IAFR acknowledgment of the plant. |
04/2007 |
|
166 |
Colmeda HPP (Pedavena, BL - Italy): Final design for repowering, and documentation for IAFR identification and acceptance |
03/2007 |
|
165 |
Castelpietra HPP (Fiera di Primiero, TN - Italy): ac and dc distribution auxiliary boards and battery charger design and Technical Specifications for purchasing |
03/2007 |
|
164 |
Rossi HPP (Arsiero VI - Italy): PLCs (Programmable logic Controllers) programming, electrical protections setting and testing, plant commissioning supervision |
02/2007 |
|
163 |
Tirso I salto (Oristano - Italy): second speed channel implementation and commissioning |
02/2007 |
|
162 |
Svrajen & Lakatnik HPP (Svoghe, Sofia - Bulgaria): kaplan double regulation turbines electronic speed governor design, supply and commissioning |
02/2007 |
|
161 |
San Giacomo di Fraele HPP (Sondrio - Italy): SCADA, PLC and electrical protections commissioning activities |
02/2007 |
|
160 |
San Giacomo di Fraele HPP (Sondrio - Italy): on site design activities for GRTN and UTF metering remote reading from Grosio |
02/2007 |
|
159 |
Predazzo MV & LV distribution network (Predazzo, TN - Italy): Electrical energy supply interruption detecting and recording system - supply, installation and commissioning |
01/2007 |
|
158 |
Gibe III (Etiopia): Electromechanical technical specification activity for a ne generation HPP with 10 Francis turbines each one of 180MW, and 400kV outdoor switchyard |
01/2007 |
|
157 |
Rossi HPP (Arsiero VI - Italy): Final and constructive design of the whole power generation train (turbines, generators, excitation systems, oil governor, etc.), plant auxiliary systems (ac, dc and general), automation-protection-supervision-telecontrol systems, 20kV MV local network interconnection |
12/2006 |
|
156 |
San Giacomo di Fraele HPP (Sondrio - Italy): SCADA, PLC and electrical protections commissioning activities during november and december 2006 |
12/2006 |
|
155 |
Busche HPP (Belluno - Italy): - some integrations to the automation system |
12/2006 |
|
154 |
Dolo HHV-HV grid station (VE - Italy): Graphical technical design activities relating to electrical, electromechanical and civil documents |
11/2006 |
|
153 |
San Giacomo di Fraele HPP (Sondrio - Italy):Functional modifications to QGBT board, to signal programming toward the remote control center, new settings and verification of the electrical protections |
11/2006 |
|
152 |
Svrajen & Lakatnik HPP (Svoghe, Sofia - Bulgaria): engineering technical support in the electrical and electromechanical supplies, including expediting activities, documentation and materials checks and validation |
10/2006 |
|
151 |
Marchesini HPP (Valdagno, VI - Italy): preliminary, final and detail design of the whole power generation train (turbines, generators, excitation systems, oil governor, etc.), plant auxiliary systems (ac, dc and general), automation-protection-supervision-telecontrol systems, 20kV MV local network interconnection |
09/2006 |
|
150 |
San Giacomo di Fraele HPP (Sondrio - Italy): Functional modifications to signal programming toward the remote control center |
11/2006 |
|
149 |
Bumbuna HPP (Sierra Leone). Basis organization of the commissioning activities from the electromechanical point of view for the new plant. |
07/2006 |
|
149 |
Castelpietra 132kV substation (Fiera di Primiero, TN - Italy): dc 110/24V static converters supply |
07/2006 |
|
148 |
Castelpietra HPP, Zivertaghe HPP, San Martino MV network (Fiera di Primiero, TN - Italy): Back-up PC for the SCADA system |
07/2006 |
|
147 |
Tirso I & II (Oristano - Italy): PLC programming activities due to database modifications towards the remote control center |
07/2006 |
|
146 |
Castelpietra 132kV substation (Fiera di Primiero, TN - Italy): design for construction of the new automation, control, protection and supervision of the substation; expediting activities of the supplied boards; direct supply of electrical protections; commissioning of the whole system, including programming, setting and verification of the differentials (2) and distance (1) protections; interface with the existing SCADA system. |
07/2006 |
|
145 |
San Giacomo di Fraele HPP (Sondrio - Italy): design changes for minor power distribution modifications (HVAC) |
05/2006 |
|
144 |
Iskar River HPP project, 9 HPP (Svoghe, Sofia - Bulgaria): Technical specifications for 9 horizontal "S"-type Kaplan turbine-synchronous generator power trains purchasing tender. Offers evaluation for the turbine-generator supplier choice, including their crossed and critical analisys, and technical discussion with the bidders. |
03/2006 |
|
143 |
Fucino HPP (Canistro, CH - Italy): Technical specifications for the electromechanical renewing of the plant |
03/2006 |
|
142 |
Cambambe HPP (Angola). Supporting Lombardi SA and Dar El Handasah experts, tender evaluation from the electromechanical point of view for the renewing of the plant. Final comments for each bidder, and final technical considerations for the decision makers. |
02/2006 |
|
142 |
San Giacomo di Fraele HPP (Sondrio - Italy): general revision to the lighting system design |
02/2006 |
|
141 |
San Giacomo di Fraele HPP (Sondrio - Italy): documentation necessary to obtain the fire fighting authority certificate for the diesel generator installed in the plant |
01/2006 |
|
140 |
Bolzano photovoltaic power plant (BZ - Italy): Preliminary, final and constructive design, expediting, controls and commissioning of the plant. SCADA systems supply. |
01/2006 |
|
139 |
San Silvestro e Caoria 132kV substations (Fiera di Primiero, TN - Italy): Technical specifications for substation's modifications according GRTN requirements |
01/2006 |
|
138 |
Bolzano HPP (BZ - Italy): flooding fighting system; engineering activities for functional schemes, terminal blocks, cables' tables modification, implementation of new logics in the PLCs, commissioning |
01/2006 |
|
137 |
Moline 220/132/9kV substation (Moline, BL - Italy): electrical protection setting, selectivity and coordination report for the operative programming of the new protective system, consequence of the new 132kV GIS system installation. |
11/2005 |
|
136 |
Rossi Street photovoltaic power plant (Rubano, PD - Italy): Supervisory system supply and commissioning for data logging and monitoring |
10/2005 |
|
135 |
Beles (Etiopia): Electromechanical technical specification activity for a ne generation HPP with 4 generating units each one of 130MVA, and 400kV outdoor switchyard |
10/2005 |
|
134 |
Castelpietra & Zivertaghe HPP (Fiera di Primiero, TN - Italy): SW procedure in the SCADA system for the next 3-days production planning |
06/2005 |
|
133 |
Svrajen & Lakatnik HPP (Svoghe, Sofia - Bulgaria): constructive design including technical specs for tender in the electrical and electromechanical supplies for 9 hydropower plants along the Iskar river; preliminary identification of the possible offerers for the various items (turbine, generator, transformers, electric boards and components, etc.) |
09/2005 |
|
132 |
Moline 220/132/9kV substation (Moline, BL - Italy): technica specification for the new protection, control, monitoring systems of the substation, consequence of the new 132kV GIS system installation. New interfacing with GRTN and Terna at the end of the outgoing HV lines |
09/2005 |
|
131 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - repowering of TRS1 and TRS2 transformers from 12/16MVA to 32/40MVA, new distribution MV metal clad switchboard incoming cubicles: substation electrical protections supply (2 distance relays, 2 transformer differential relays, 2 feeder relays, 2 busbar voltage and frequency relays). |
06/2005 |
|
130 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - repowering of TRS1 and TRS2 transformers from 12/16MVA to 32/40MVA, new distribution MV metal clad switchboard incoming cubicles:
Engineering technical support for the definition, screening and follow up of the sub-suppliers.
Hot stand by automation PLC devices programming (PLC Schneider Quantum series).
SCADA supervision system programming, and its hot stand by functionnality activation and commissioning.
Programming, setting and verification of all substation new electrical protections (distance, differential and feeder General Electric UR series, MIV GE series).
Commissioning of the revamped bays. |
06/2005 |
|
129 |
Tirso I salto (Oristano - Italy): Functional modifications for the insertion of a new SW power regulator for the new data exchange protocol with the remote control center. |
07/2005 |
|
128 |
HPP and MV distribution supervision (Fiera di Primiero, TN - Italy): implementation of a remote access for telemonitoring and remote technical support through ADSL telephone line |
06/2005 |
|
127 |
Castelpietra HPP (Fiera di Primiero, TN - Italy): PLC and SCADA SW personalization in consequence to the change of the 3-phase synchronous generators, to obtain green certificates; commissioning of the system |
04/2005 |
|
126 |
Malpensa 2000 (MXP2000 airport - Italy): Upgrading of the TG3 turbogas production unit automation and protection bay unit in consequence of the realization of a new production 15,6kV busbar, interconnecting the TG3 (turbogas, 28,5 MW) and TV4 (turbosteam, 8MW) and 32/40MVA TRS3 132/15,6kV; supply, programming, setting verification and commissioning of a new busbar differential protection, new setting and verification of the existing protection relays, system commissioning |
03/2005 |
|
125 |
Castelpietra HPP, Zivertaghe HPP, San Martino MV network (Fiera di Primiero, TN - Italy): various supplies for complementary activities related to SCADA system |
08/2004 |
|
124 |
San Giacomo di Fraele HPP (Sondrio - Italy): detail electromechanical engineering and design, including:
- techical reports for the correct electrical dimensioning of the plant
- detail functional design (schemes) of the unit and of auxiliary/general services
- detail functional design (schemes) of the MV switcboard
- detail functional design (schemes) of internal/external lighting
- detail functional design (schemes) of sockets system (motive power)
- programming, setting and verification of electrical protection relays
- SW programming of unit and auxiliary services PLCs automation
- SICAM programming for remote control center interfacing and time-stamped plant register
- SCADA programming
- expediting and factory tests of all electrical boards
- plant commissioning |
12/2004 |
|
123 |
Bolzano HPP (BZ - Italy): supply of some necessary devices for the local transmission data network |
10/2004 |
|
122 |
Ecotermica (San Martino di Castrozza, TN - Italy): incorporation in the production and distribution SCADA system |
08/2004 |
|
121 |
Busche HPP (BL - Italy): SW PLC and SCADA programming, plant commissioning and training courses on PLC and SCADA systems; power regulator with accelerometric control, water level regulator and discharge water flow regulator implementation |
08/2004 |
|
120 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - Hot stand by CPU's firmware upgrade activities, with system on service. |
08/2004 |
|
119 |
Malpensa 2000 MV and LV distribution network - Terminal 1 e 2 (MXP2000 airport - Italy): fianl design and technical specifications for renewing activities on the telecontrol and remote management of the MV and LV airport distribution network, new redundant SCADA architecture, new high speed and high capacity fiber optic data transmission ring, automatic load rejection system |
07/2004 |
|
118 |
Zivertaghe HPP (Fiera di Primiero, TN - Italy): various supplies for complementary activities related to automation and SCADA system |
07/2004 |
|
117 |
Venezia, medium-high tide defense (VE - Italy). Preliminary design of the electric power, automation and remote control and command for the "Insula di San Giuseppe", corresponding to the macro-insula of "Giardini - via Garibaldi - Tana, in Venezia - Sestriere di Castello" |
04/2004 |
|
116 |
Bolzano HPP (BZ - Italy). Preliminary and detail design of the automation, protection, control and remote monitoring of the plant.
Implementation of all the automation codes of the two units and of the auxiliary/general services on Siemens Simatic S7-400 with ET-200M decentralized periphery and TP370 HMI touch panels.
Interfacing towards the remote control center via IEC 870-5-101 protocol
Programming, setting and verification of the electrical protection relays (Siemens Siprotec).
Plant commissioning |
04/2004 |
|
115 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - improvement of the network disconnection capability of two turbogas units (TG1 and TG2) in case of islanding. |
02/2004 |
|
114 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - supply and installation of hardware components parts of the substation automation system (PLC's Ethernet cards), some cards firmware upgrade, software maintenance of the whole system |
02/2004 |
|
113 |
Castelpietra HPP, Zivertaghe HPP, San Martino MV network (Fiera di Primiero, TN - Italy). Supply, installation and commissioning of the wireless 2,4Ghz telecontrol network system (directional parabolic antennas), for Fiera di Primiero and San Martino di Castrozza sites interconnection |
12/2003 |
|
112 |
Castelpietra HPP (Fiera di Primiero, TN - Italy). Technical and economical specifications for two new 3-phase synchronous generators tender, with closed cycle cooling system |
12/2003 |
|
111 |
Matese I salto HPP (Matese, CS - Italy): specialist on-site activities for minor SW modifications |
10/2003 |
|
110 |
ACSM MV distribution network (Fiera di Primiero, TN - Italy). Detail design for renewing of all MV switchboards of the whole 10 and 20kV distribution network (Castelpietra, Zivertaghe, San Martino Sottostazione, San Martino Sede, San Martino Europa), supply of informatic systems, optical-electrical-wireless transmission networks and related active/passive devices, multifunctional digital electric portection relays, various equipments and spare parts |
09/2003 |
|
109 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - load rejection system completion |
09/2003 |
|
108 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - Training courses for the Malpensa Energia operators upon the management of the new 132kV TRS3 bay (TR 40MW, turbogas 28,5MW) |
09/2003 |
|
107 |
TEL HPP (Merano, BZ - Italy): On-site activity for the automatic logics functionality check |
08/2003 |
|
106 |
Castelpietra HPP, Zivertaghe HPP, San Martino MV network (Fiera di Primiero, TN - Italy). Turn-key system.
Supply and implementation of the supervision system of the prouction plants and of the HV/MV distribution network, of the water reservoirs, of the videosurveillance, of the new digital electricaal protection system for MV feeders, including the possibility of production and selling to third parts (GRTN) planning.
Management of the electrical energy supply interruption detection and recording, as per Autorita per l'Energia Elettrica requirements
Management of the oscillperturbographics records and of the time stamping events within a millisecond precision, based on GPS signal synchronization
Wireless interconnection of the actually not communicating plants by the realization of a WAN for plants command, control and supervision
Management of the production planning of the 2 HPP (Castelpietra and Zivertaghe) |
05/2003 |
|
105 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - Turn-key System.
Supervision system (SCADA) supply, and interfacing towards GRTN by protocol IEC 60870-5-104.
Modifications and upgrade of the MV oscillographic system |
02/2003 |
|
104 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy). Hot stand by PLC control system commissioning (TRS3 bay, PAR and PLC modules) |
02/2003 |
|
103 |
Tirso I salto, Tirso II salto, Pedra 'e Othoni (Sardegna, Italy): detail functional design, SW PLCs and SCADA programming commissioning activities and training courses to operators about PLC and SCADA systems. |
01/2003 |
|
102 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - Detail functional design and technical specifications for tender concerning the change of the existing two 12/16MVA transformers with others with 32/40MVA capacity |
09/2002 |
|
101 |
Degano HPP, Sostasio HPP (Carnia, UD - Italy). Supply and programming of two HMI panels |
09/2002 |
|
100 |
Technical specification. Technical specification development for HPP electromechanical tendering |
09/2002 |
|
99 |
Novel (VC, Italy). Integrations and more scenarios for the co-generation plant load flow study |
09/2002 |
|
98 |
Degano HPP, Sostasio HPP (Carnia, UD - Italy). Remote support and monitoring for both HPP |
08/2002 |
|
97 |
"Acqua Vera" water pumping and bottling plant (San Giorgio in Bosco, PD - Italy). Plant MV network: loads and electrical perturbations analisys |
08/2002 |
|
96 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - substation automation sysytems SW code programming in the hot stand by PLC QUANTUM configuration and in the fiber optic Ethernet 10/100 Mbit/s redundant network |
06/2002 |
|
95 |
Novel (VC, Italy). Co-generation plant load flow study, with a set of different scenarios |
06/2002 |
|
94 |
Grosio HPP (Sondrio - Italy). Functional modifications to the detail design (schemes) |
06/2002 |
|
93 |
Matese I salto (Matese, CS - Italy). Extra SW intergrations required by the final client |
02/2002 |
|
92 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - Detail design for a new 132kV transformer bay expansion of a 32/40MVA trafo, interconnecting a new 30MVA turbogas generator |
02/2007 |
|
91 |
Premadio HPP (Sondrio - Italy). Electrical engineering consulting services for the third unit of the plant - project Premadio II |
06/2002 |
|
90 |
Castelpietra HPP (Fiera di Primiero, TN - Italy). Technical specifications for mainteinance of twe 3-phase synchronous generators, for purchasing of two new static exciters, of a new 10kV MV production switchboard and all the necessary interconnections.
Detail functional design and PLC's SW programming for the plant and 10/20kV distribution network automation completion.
Plant commissioning. |
12/2001 |
|
89 |
Matese I salto (Matese, CS - Italy). Training courses for technical and management operators (3 weeks) |
12/2001 |
|
88 |
Desalinization and power generating plant (Jebel Ali - Dubai). Analisys and solving of pending items and claims with the final client (DEWA), the consultant (FICHTNER Int.) and with the ENELPOWER subcontractors (SIEMENS, ALSTOM, FUJI, etc.) for the activities related to the GIS substations 132kV and 400kV and main supplies (580MVA autotransformers, 132kV cables, etc.). |
12/2001 |
|
87 |
Desalinization and power generating plant (Jebel Ali - Dubai). Engineering activities concerning the D-Substation 400/132kV, with GIS section 400kV Alstom.
Detail functional design for the command, control and protection of n 3 interconnecting autotransformers of 580MVA each |
12/2001 |
|
86 |
Sostasio HPP (Carnia, UD - Italy). Supply, installation, programming and commissioning of the remote control center in Tolmezzo. |
09/2001 |
|
85 |
Degano HPP (Carnia, UD - Italy). Remote support and monitoring |
09/2001 |
|
84 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - Preliminary, final and detail design with technical specifications for tender for the installation of a new 132kV TRS3 transformer bay (40MVA) for the interconnection of a new turbogas rated 30MVA and a steam turbine of 8MVA.
Renewing of all command, protection and control boards of the substation's bays with a new programmable logic redundant technology |
07/2001 |
|
83 |
Fadalto HPP (Vittorio Veneto, BL - Italy): PLC SW code programming for the management of the auxiliary services |
07/2001 |
|
82 |
Rendelstein HPP (Bolzano - Italy). Preliminary, final and detail design of the whole renewed plant (civil parts included).
Documents (tecnical specifications, authorizations, etc.) and drawings for bid emission.
Offers evaluation and choice of the winners.
Expediting, contractors follow-up, factory tests, commissioning supervision and co-ordination.
PLC and SCADA SW code programming and commissioning. |
05/2001 |
|
81 |
Grosio HPP, unit n 4 (Sondrio - Italy). Turn-key engineering consulting and design activities for the following:
- Basis engineering for the tender technical specifications application;
- Detail electrical and plant design for all electrical and automation systems in charge to VSM;
- Detail front-end engineering including developing, management and commissioning of interfaces towards other plant systems;
- Technical reports, detail and construction drawings production;
- Instruction, use and manteinance manuals of the system;
- Manuals and MoM for the commissioning phase;
- Technical specifications for the complete BOP purchasing
- Electrical functional schemes adapting actions. |
04/2001 |
|
80 |
Castelpietra HPP (Fiera di Primiero, TN - Italy). Detail electromechanical engineering design, including:
technical specifications for new turbine safety spherical valves and oil governor/speed regulator purchase;
Fuctional schemes for automation, control and protection boards;
PLCs programming;
Factory tests in supplier's shops;
Commissioning supervision and co-ordination for the whole plant;
Pre-settings for the future 132kV compact substation suprevision from the HPP. |
11/2000 |
|
79 |
Cesano Maderno substation (Cesano Maderno, MI - Italy) - Activities to monitoring and control from the remote control center of all HV bays |
09/2000 |
|
78 |
Cesano Maderno substation (Cesano Maderno, MI - Italy) - as-built functional drawings af alla HV bays |
08/2000 |
|
77 |
Matese I salto HPP (Matese, CS - Italy). Detail electromechanical design, automation and supervision systems definition and programming, factory tests on boards and plant commissioning supervision. |
07/2000 |
|
76 |
Degano HPP and Sostasio HPP (Carnia, UD - Italy). Remote support and monitoring from Impel Systems HQ |
05/2000 |
|
75 |
Degano HPP (Carnia, UD - Italy). Plant commissioning. |
04/2000 |
|
74 |
Mushrooms production plant (Crocetta del Montello, TV - Italy). Technical report for fault analisys |
02/2000 |
|
73 |
Bassano plant (Bassano, VI - Italy): Analisys of presence and degree of armonics in the plant. Solution proposal for their limitation. |
11/1999 |
|
72 |
Plant consulting activities |
10/1999 |
|
71 |
Degano HPP (Carnia, UD - Italy). Detail electromechanical design (including Francis vertical turbine refurbishing, one new 3-phase synchronous generator, new command and control boards), automation and supervision systems definition, factory tests on boards and plant commissioning supervision. |
09/1999 |
|
70 |
Degano HPP (Carnia, UD - Italy). Automation SW code program for two units and auxiliary/general services, including power regulation, cosfi regulation, water leve regulation. |
09/1999 |
|
69 |
Degano HPP (Carnia, UD - Italy). SCADA HW system and SW code programming for data recording and remote control of the plant |
09/1999 |
|
68 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - Detail design, documentation update and supervision for some modifications introduced for manteinance purposes. |
09/1999 |
|
67 |
TEL HPP (Merano, BZ - Italy): Some modifications on 110V dc auxiliary services |
08/1999 |
|
66 |
Cartagena, Thermal power plant (Cartagena - Colombia). Speed regulator digital control card repair, last spare for a thermal power generation unit |
07/1999 |
|
65 |
Diesis HPPs (various sites - Italy): Technical-economical report on the sold HPP |
07/1999 |
|
64 |
Ex Sava HPP (San Silvestro, Moline, Caoria, Val Schener; Fiera di Primiero, TN - Italy): In co-operation with a working team, plants' state-of-the-art evaluation, and technical proposal to guarantee the safe working of the plants in the following 5 years, in order to produce an economical report for the business and industrial plans for the plant purchase by ACSM SpA. |
06/1999 |
|
63 |
San Francisco and Pimentel Substations (Santo Domingo): Technical and economical tender documentation for the realization of the two substations (offer). |
06/1999 |
|
62 |
Mobile substations (Iraq): Technical and economical tender documentation for the realization of 5 on-truck mobile substations (offer). |
06/1999 |
|
61 |
Training course (Italy): ISO 9000 quality course for engineers |
04/1999 |
|
60 |
TEL HPP (Merano, BZ - Italy): Plant completion |
04/1999 |
|
59 |
Cesano Maderno substation (Cesano Maderno, MI - Italy) - Functional detail schemes for HV lines n. 072 and 150. |
03/1999 |
|
58 |
Sostasio HPP (Carnia, UD - Italy). Support to the engineer responsible of the works with reference to the electromechanical activities. |
02/1999 |
|
57 |
Eritrean HV trasmission network (Ertirea). Load flow study with node network potential analisys, using PowerWorld Simulator software |
02/1999 |
|
56 |
Degano HPP (Carnia, UD - Italy). Automatic logics and circuits renewing |
09/1998 |
|
55 |
Marco Polo airport (Venezia - Italy): Electrical power distribution and data trasmission cable ways placing and positioning. |
07/1998 |
|
54 |
TEL HPP (Merano, BZ - Italy): Automatic logics and circuits modifications |
08/1998 |
|
53 |
Chiaula HPP (Carnia, UD - Italy). Preliminary and final electromechanical design of the whole new plant (horizontal Pelton turbine, civil parts not included). |
07/1998 |
|
52 |
Cesano Maderno substation (Cesano Maderno. MI - Italy): functional schemes production for a 120MVA 220/130kV autotransformer bay, for a 6MVA 220/130kV transformer bay, for 220kV (n.223, 226) and 132kV (150, 072) OHL bays |
06/1998 |
|
51 |
Crion substation (Porto Marghera, VE - Italy): Consulting engineering for the new substation |
05/1998 |
|
50 |
Eritrean HV trasmission network (Ertirea). Some minor functional modifications in the drawings of alla substations. |
05/1998 |
|
49 |
Centro Polifunzionale Ghiaie (Trento, Italy). Relevant area external lighting design. |
03/1998 |
|
48 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - Commissioning and supervision activities |
01/1998 |
|
47 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - Minor functional modifications and as-built production. |
01/1998 |
|
46 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - Training course completed by all the support documentation for the management operators (10 technicians) |
01/1998 |
|
45 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - Substation commissioning |
12/1997 |
|
44 |
Porto Corsini thermal power plant (Porto Corsini, RA - Italy). Electrical protection boards schemes: as-built |
11/1997 |
|
43 |
Sostasio HPP (Carnia, UD - Italy). Preliminary, final and detail design of the whole new plant (2 horizontal Francis turbines, civil parts not included).
Documents (tecnical specifications, authorizations, etc.) and drawings for tender emission.
Offers evaluation and choice of the winners. |
08/1997 |
|
42 |
Detail electromechanical and civil design of the following HV substations:
- Hirgigo 132/66/15kV (n. 6 of 28.5MVA step-up and n. 2 of 12MVA IBT transformers),
- Asmara East 132/66/15kV (n. 2 of 60MVA IBT transformers),
- Dekemhare 66/15kV (n. 2 of 3MVA step-down transformers),
- Keren 66/15kV (n. 2 of 3MVA step-down transformers),
- Mendefera 66/15kV (n. 2 of 3MVA step-down transformers).
The activities include:
- electrical technical reports and calculations short circuit currents, lightning strokes protection, earthing systems, etc.),
- all steel supporting equipment dimensioning, calculation and detail design (portals, columns, ecc.),
- detail civil design and calculations for a local independent civil tender (basements, foundations, buildings, cable ways, transformers oil tanks, drainage systems, reinforcements, etc.),
- detail design for control, command, protection, remote control systems
- purchasing technical specifications, and technical evaluation of the received offers,
- technical interface with all sub-contractors |
06/1997 |
|
41 |
Matese I and II salto HPPs (Matese, CS - Italy). Technical co-ordination and supervision during tender phase for renewing of the HPP plants and the ENEL HV distribution substation, including offer technical requests to sub-suppliers and their following technical check and validation |
02/1997 |
|
40 |
Malpensa 2000 substation 132/15,6kV (MXP2000 airport - Italy) - detail design af the control, protection, command, automation and remote control of the substation. |
02/1997 |
|
39 |
Sorio HPP (Sorio, VR - Italy) - detail design of the control, protection, command, automation and remote control of the HPP |
11/1996 |
|
38 |
TEL HPP (Merano, BZ - Italy). Consulting engineering activities |
10/1996 |
|
37 |
Turbigo inferiore (Turbigo, MI - Italy). Final design of the control, protection, command, automation and remote control of the HPP. Order cancelled by ENEL to assignor |
07/1996 |
|
36 |
Dietro la Torre (Usseglio, TO - Italy). Final design of the control, protection, command, automation and remote control of the HPP. Order cancelled by ENEL to assignor |
04/1996 |
|
35 |
TEL HPP (Merano, BZ - Italy). commissioning activity and supervision of n. 4 horizontal double Francis units of 10 MVA each |
04/1996 |
|
34 |
Training course (Lecco, LC - Italy). Standard ENEL automation systems course |
02/1996 |
|
33 |
Porto Corsini thermal power plant (Porto Corsini, RA - Italy). Detail design and schemes for a double channel digital electric protection systems, for thermal generation group n.4 (including unit starting transformer) |
02/1996 |
|
32 |
Edolo 380 kV substation (Edolo, BS - Italy). Detail design of the command, control, automation, protection and supervision systems of the 380kV outdoor substation, including the 15kV, 400V ac and 110V dc external auxiliary services, including all the interconnection with the existing boards and systems (mimic, telecontrol, 400kV breaker failure, 400kV GIS in cavern, 400kV oil-insulated cables thermal protections) |
12/1995 |
|
31 |
Fusina thermal power plant (Fusina, VE - Italy). Detail design and schemes for a double channel digital electric protection systems, for thermal generation group |
09/1995 |
|
30 |
TEL HPP 10,5kV switchboard (Merano, BZ - Italy). Detail design and schemes for shop construction of the switchboard (Siemens 8BK20 type) |
07/1995 |
|
29 |
Various HPP plants (Italy). revision and correction of the functional electromechanical schemes of the following plants
- Roncaglia (1 unit, Francis turbine, synchronous generator, 1608 kVA),
- Clanezzo (1 unit, Kaplan turbine, synchronous generator, 2496 kVA),
- Vigevano (1 unit, Kaplan turbine, synchronous generator, 3414 kVA),
- Aymavilles (2 units, Francis turbines, synchronous generators, 4825 kVA each),
- Grand'Eyvia (1 unit, Kaplan turbine, asynchronous generator, 1810 kW),
- Moline (2 units, Francis turbines, synchronous generators, 1580 kVA each) |
02/1995 |
|
28 |
Training course (Lecco, LC - Italy). Standard ENEL automation systems course |
02/1995 |
|
27 |
TEL HPP (Merano, BZ - Italy). Detail functional design for construction, SW PLCs programming (4 horizontal Francis units of 10 MVA each) |
02/1995 |
|
26 |
Training course (Lecco, LC - Italy). Standard ENEL automation systems course |
04/1994 |
|
25 |
Sorio HPP (Sorio, VR - Italy). Detail funcyional design and technical specification of the command, control, automation, telecontrol systems of the plant, for tender emission. |
01/1994 |
|
24 |
Various HPP plants (Italy). revision and correction of the functional electromechanical schemes |
11/1993 |
|
23 |
Moline HPP (Mondovi, CN - Italy). revision and correction of the functional electromechanical schemes |
11/1993 |
|
22 |
ENEL standards and Alanno HV substation (Giulianova - Italy). Supply of engineering services for the planning of the "Control System for double busbar electrical power stations with counterposed bays, connected to the hydro-electric power stations", completed with the drawing up of the project for the Control System for the AT station of the power plant in Alanno (no. 8 bays for 132 kV OHL and no. 2. for hydro-electric groups). |
10/1993 |
|
21 |
Training course (Lecco, LC - Italy). Standard ENEL automation systems course |
06/1993 |
|
20 |
Training course (Lecco, LC - Italy). Standard ENEL automation systems course |
04/1993 |
|
19 |
Calore San Mango HPP (Calore, AV - Italy): in temporary enterprise association with a civil engineers firm, the following engineering services have been supplied for the renewal of the HPP (no. 1 synchronous Francis group of 8,5 MVA):
- feasibility study;
- preliminary design;
- executive design (up to terminal blocks of each board or equipment and cables definition);
- preparation of all Technical Specification for the electro-mechanical tender;
- technical management during the start up procedure (to be completed after tender of supply);
|
01/1993 |
|
18 |
Various HPP plants (Italy). Studies and programs for the HPP electric systems design |
10/1992 |
|
17 |
Training course (Lecco, LC - Italy). Standard ENEL automation systems course |
03/1992 |
|
16 |
Various HPP plants (Italy). revision and correction of the functional electromechanical schemes |
02/1992 |
|
15 |
ENEL 20kV distribution substation (Cardone - Italy): design of diagrams, charts, schemes, drawings and technical specifications for 20 kV panel for the up-grading of the plant |
02/1992 |
|
14 |
TOMBO thermal power plant (Guinea Conackry): Technical evaluation report and electrical protections setting and co-ordination proposals |
06/1991 |
|
13 |
EL ARISH diesel power plant (Egypt). On site data acquisition activity, to identify some high speed disturbances, and final technical report with solution proposals |
05/1991 |
|
12 |
Various HPP plants (Italy). revision and correction of the functional electromechanical schemes |
04/1991 |
|
11 |
Various HPP plants (Italy). Studies and programs for the HPP electric systems design |
03/1991 |
|
10 |
Tes 1 HPP (Giava - Indonesia). Manuals for plant commissioning |
02/1991 |
|
9 |
Various HPP plants (Italy). Study for the design standardization |
01/1991 |
|
8 |
Training course (Lecco, LC - Italy). Standard ENEL automation systems course |
01/1991 |
|
7 |
Sor River HPP (Ethiopia). Manuals for plant commissioning |
12/1990 |
|
6 |
Barca, Cardone e Poggio Diana HPP (South of Italy). Feasibility study for plant renewing |
10/1990 |
|
5 |
Starjy Oskol 130/10 kV substation (URSS). Detail functional design, co-ordination activities, schemes verification and factory tests for boards and equipment |
06/1990 |
|
4 |
Feshi HPP (Congo). Technical specifications and drawings for equipment purchasing and construction |
03/1990 |
|
3 |
Tes 1 HPP (Giava - Indonesia) and Sor River HPP (Ethiopia): Post-construction, pre-operational and start-up manuals for commissioning activities |
11/1989 |
|
2 |
RFX 380/20kV substation (Camin, PD - Italy). In co-operation with Mazzalai (electrical-civil works company), electrical connections design in the AT and BT equipment and the supervision during the start up of the 380/20 kV station for the nuclear fusion project RFX |
11/1989 |
|
1 |
Tes 1 HPP (Giava - Indonesia). Detail design of the command, control and protection systems, including the PLC software implementation for the automation system (n. 4 Francis units of 4,5 MVA each) |
10/1989 |
|