Hydroelectric power plants
- Total renewing or refurbishing of plant (civil, mechanic and electric)
- Partial renewing of plant (existing groups automation and supervision)
- Developing of preliminary, final, detail design of electro-mechanic system (up to realization)
- Technical specifications and material list definition for electro-mechanic systems and components tenders
- Operating manuals for the following test phases:
- post-construction
- pre-operational
- start-up
- Programmable Logic Controllers software design and implementation for the plant automatization
- SCADA software design and implementation for the plant remote control
- Plant commissioning, from blank tests to the synchronization with the electric network, from rotation to load rejections, even including automatic logics sequences verification and software tests
- Technical and economical relations concerning hydroelectric power plants